New Boiler System Installed at Wisco

This summer, a new dual-boiler system was installed at the high school. The previous system was 58 years old (installed when the school was built!), and this past fall, the backup boiler was starting to fail.

A huge thank you to our supporters who helped us raise $500,000 for the new system. Come fall, our students can enjoy the warmth and reliance of this new system! Names for the new twin boilier system coming soon . . .
Back
Phone: 414-453-4567  |  Fax: 414-453-3001